Events in May 2022
SunSunday | MonMonday | TueTuesday | WedWednesday | ThuThursday | FriFriday | SatSaturday |
---|---|---|---|---|---|---|
May 1, 2022(3 events)
All day: Runway open (at reduced length) to May 13th.All day: Runway open (at reduced length) to May 13th. All day In working with the contractor Fulton Hogan, Council have secured a plan to allow the runway to open in a reduced length capacity as of 4 March 2022 - (weather permitting) for day VFR only from 0630 – 1800 as no aerodrome lighting will be available at this stage. Please remember circuit training flights can begin at 0800. There will be works on going during this period please check your notams prior to leaving home to come to airport for your flight for information regarding works or other information. This will allow operations in a limited capacity to continue until 13 May at this stage at which time the runway will then close to fixed wing traffic until the anticipated re-opening date of 1 Aug 2022 Runway 17 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway 35 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway access from the western side will be via taxiway A to A2 ( the one by the windsock). Runway access from the Eastern side will be via Taxiway B. Backtracking will be permitted to RWY 17/35 reduced length threshold. Note 1 ::::: Access to and from the Eastern Apron will be restricted to aircraft located in the Eastern hangar and helicopter traffic there is no other parking available on the Eastern Apron for fixed wing aircraft at this stage due to works in progress. Note 2:::: There will be a minor disruption on the first fine weather day in order to allow the reduced threshold markings to be painted on the runway. Estimated time for this to occur is 5 hours of which the runway will be unavailable. Other information Skyfuel area on the taxiway B is open as is the alternate skyfuel location on Western apron. Some hangar areas such as the SW hangars will experience a closure period to enable the new taxiway C to be constructed. (Dates TBC) Taxiway A3 and A4 are closed. Taxiway B1 open to the fuel area open – taxiway B to eastern apron closed to other non-authorised traffic. Grass strip areas will be closed. Due to the standing surface water that occurs on the runway, the runway may be closed due to rainfall to prevent aquaplaning or reducing the risk of a runway excursion. Overnight parking for transient aircraft will be limited to prior notice bookings only. All enquiries should be directed to Airport Operations on 02 4993 4228 or airport@cessnock.nsw.gov.au Regards Tony Allan Airport Coordinator All day: 48-78 Holden Car Club VisitAll day: 48-78 Holden Car Club Visit All day HRFC has received a proposal to host a visit from the 48 to 78 Holden Car Club on the first Sunday of May. Details to be confirmed, 12:00 pm: HRFC Social Day & Car Club Visit.12:00 pm: HRFC Social Day & Car Club Visit. – Social Day and Car Club Visit NO GENERAL MEETING this month. HRFC Monthly BBQ & General Meetings are held on the 2nd Sunday of each month EXCEPT January (No meeting) and May (Moved to the first Sunday to avoid a clash with "Mother's Day"). Visitors are always welcome, and meetings are held at the HRFC Clubhouse, Grady Rd Pokolbin NSW (Western side of Cessnock Airport). Use this link for directions when driving. https://www.google.com/maps/place/Hunter+Recreational+Flying+Club/@-32.7848255,151.334696,17z/data=!4m5!3m4!1s0x6b733548c79d291d:0x2c0387b791dbb93c!8m2!3d-32.7848392!4d151.336906 Hunter Recreational Flying Club
Grady Rd
Pokolbin, NSW
|
May 2, 2022(1 event)
All day: Runway open (at reduced length) to May 13th.All day: Runway open (at reduced length) to May 13th. All day In working with the contractor Fulton Hogan, Council have secured a plan to allow the runway to open in a reduced length capacity as of 4 March 2022 - (weather permitting) for day VFR only from 0630 – 1800 as no aerodrome lighting will be available at this stage. Please remember circuit training flights can begin at 0800. There will be works on going during this period please check your notams prior to leaving home to come to airport for your flight for information regarding works or other information. This will allow operations in a limited capacity to continue until 13 May at this stage at which time the runway will then close to fixed wing traffic until the anticipated re-opening date of 1 Aug 2022 Runway 17 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway 35 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway access from the western side will be via taxiway A to A2 ( the one by the windsock). Runway access from the Eastern side will be via Taxiway B. Backtracking will be permitted to RWY 17/35 reduced length threshold. Note 1 ::::: Access to and from the Eastern Apron will be restricted to aircraft located in the Eastern hangar and helicopter traffic there is no other parking available on the Eastern Apron for fixed wing aircraft at this stage due to works in progress. Note 2:::: There will be a minor disruption on the first fine weather day in order to allow the reduced threshold markings to be painted on the runway. Estimated time for this to occur is 5 hours of which the runway will be unavailable. Other information Skyfuel area on the taxiway B is open as is the alternate skyfuel location on Western apron. Some hangar areas such as the SW hangars will experience a closure period to enable the new taxiway C to be constructed. (Dates TBC) Taxiway A3 and A4 are closed. Taxiway B1 open to the fuel area open – taxiway B to eastern apron closed to other non-authorised traffic. Grass strip areas will be closed. Due to the standing surface water that occurs on the runway, the runway may be closed due to rainfall to prevent aquaplaning or reducing the risk of a runway excursion. Overnight parking for transient aircraft will be limited to prior notice bookings only. All enquiries should be directed to Airport Operations on 02 4993 4228 or airport@cessnock.nsw.gov.au Regards Tony Allan Airport Coordinator |
May 3, 2022(1 event)
All day: Runway open (at reduced length) to May 13th.All day: Runway open (at reduced length) to May 13th. All day In working with the contractor Fulton Hogan, Council have secured a plan to allow the runway to open in a reduced length capacity as of 4 March 2022 - (weather permitting) for day VFR only from 0630 – 1800 as no aerodrome lighting will be available at this stage. Please remember circuit training flights can begin at 0800. There will be works on going during this period please check your notams prior to leaving home to come to airport for your flight for information regarding works or other information. This will allow operations in a limited capacity to continue until 13 May at this stage at which time the runway will then close to fixed wing traffic until the anticipated re-opening date of 1 Aug 2022 Runway 17 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway 35 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway access from the western side will be via taxiway A to A2 ( the one by the windsock). Runway access from the Eastern side will be via Taxiway B. Backtracking will be permitted to RWY 17/35 reduced length threshold. Note 1 ::::: Access to and from the Eastern Apron will be restricted to aircraft located in the Eastern hangar and helicopter traffic there is no other parking available on the Eastern Apron for fixed wing aircraft at this stage due to works in progress. Note 2:::: There will be a minor disruption on the first fine weather day in order to allow the reduced threshold markings to be painted on the runway. Estimated time for this to occur is 5 hours of which the runway will be unavailable. Other information Skyfuel area on the taxiway B is open as is the alternate skyfuel location on Western apron. Some hangar areas such as the SW hangars will experience a closure period to enable the new taxiway C to be constructed. (Dates TBC) Taxiway A3 and A4 are closed. Taxiway B1 open to the fuel area open – taxiway B to eastern apron closed to other non-authorised traffic. Grass strip areas will be closed. Due to the standing surface water that occurs on the runway, the runway may be closed due to rainfall to prevent aquaplaning or reducing the risk of a runway excursion. Overnight parking for transient aircraft will be limited to prior notice bookings only. All enquiries should be directed to Airport Operations on 02 4993 4228 or airport@cessnock.nsw.gov.au Regards Tony Allan Airport Coordinator |
May 4, 2022(1 event)
All day: Runway open (at reduced length) to May 13th.All day: Runway open (at reduced length) to May 13th. All day In working with the contractor Fulton Hogan, Council have secured a plan to allow the runway to open in a reduced length capacity as of 4 March 2022 - (weather permitting) for day VFR only from 0630 – 1800 as no aerodrome lighting will be available at this stage. Please remember circuit training flights can begin at 0800. There will be works on going during this period please check your notams prior to leaving home to come to airport for your flight for information regarding works or other information. This will allow operations in a limited capacity to continue until 13 May at this stage at which time the runway will then close to fixed wing traffic until the anticipated re-opening date of 1 Aug 2022 Runway 17 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway 35 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway access from the western side will be via taxiway A to A2 ( the one by the windsock). Runway access from the Eastern side will be via Taxiway B. Backtracking will be permitted to RWY 17/35 reduced length threshold. Note 1 ::::: Access to and from the Eastern Apron will be restricted to aircraft located in the Eastern hangar and helicopter traffic there is no other parking available on the Eastern Apron for fixed wing aircraft at this stage due to works in progress. Note 2:::: There will be a minor disruption on the first fine weather day in order to allow the reduced threshold markings to be painted on the runway. Estimated time for this to occur is 5 hours of which the runway will be unavailable. Other information Skyfuel area on the taxiway B is open as is the alternate skyfuel location on Western apron. Some hangar areas such as the SW hangars will experience a closure period to enable the new taxiway C to be constructed. (Dates TBC) Taxiway A3 and A4 are closed. Taxiway B1 open to the fuel area open – taxiway B to eastern apron closed to other non-authorised traffic. Grass strip areas will be closed. Due to the standing surface water that occurs on the runway, the runway may be closed due to rainfall to prevent aquaplaning or reducing the risk of a runway excursion. Overnight parking for transient aircraft will be limited to prior notice bookings only. All enquiries should be directed to Airport Operations on 02 4993 4228 or airport@cessnock.nsw.gov.au Regards Tony Allan Airport Coordinator |
May 5, 2022(1 event)
All day: Runway open (at reduced length) to May 13th.All day: Runway open (at reduced length) to May 13th. All day In working with the contractor Fulton Hogan, Council have secured a plan to allow the runway to open in a reduced length capacity as of 4 March 2022 - (weather permitting) for day VFR only from 0630 – 1800 as no aerodrome lighting will be available at this stage. Please remember circuit training flights can begin at 0800. There will be works on going during this period please check your notams prior to leaving home to come to airport for your flight for information regarding works or other information. This will allow operations in a limited capacity to continue until 13 May at this stage at which time the runway will then close to fixed wing traffic until the anticipated re-opening date of 1 Aug 2022 Runway 17 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway 35 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway access from the western side will be via taxiway A to A2 ( the one by the windsock). Runway access from the Eastern side will be via Taxiway B. Backtracking will be permitted to RWY 17/35 reduced length threshold. Note 1 ::::: Access to and from the Eastern Apron will be restricted to aircraft located in the Eastern hangar and helicopter traffic there is no other parking available on the Eastern Apron for fixed wing aircraft at this stage due to works in progress. Note 2:::: There will be a minor disruption on the first fine weather day in order to allow the reduced threshold markings to be painted on the runway. Estimated time for this to occur is 5 hours of which the runway will be unavailable. Other information Skyfuel area on the taxiway B is open as is the alternate skyfuel location on Western apron. Some hangar areas such as the SW hangars will experience a closure period to enable the new taxiway C to be constructed. (Dates TBC) Taxiway A3 and A4 are closed. Taxiway B1 open to the fuel area open – taxiway B to eastern apron closed to other non-authorised traffic. Grass strip areas will be closed. Due to the standing surface water that occurs on the runway, the runway may be closed due to rainfall to prevent aquaplaning or reducing the risk of a runway excursion. Overnight parking for transient aircraft will be limited to prior notice bookings only. All enquiries should be directed to Airport Operations on 02 4993 4228 or airport@cessnock.nsw.gov.au Regards Tony Allan Airport Coordinator |
May 6, 2022(1 event)
All day: Runway open (at reduced length) to May 13th.All day: Runway open (at reduced length) to May 13th. All day In working with the contractor Fulton Hogan, Council have secured a plan to allow the runway to open in a reduced length capacity as of 4 March 2022 - (weather permitting) for day VFR only from 0630 – 1800 as no aerodrome lighting will be available at this stage. Please remember circuit training flights can begin at 0800. There will be works on going during this period please check your notams prior to leaving home to come to airport for your flight for information regarding works or other information. This will allow operations in a limited capacity to continue until 13 May at this stage at which time the runway will then close to fixed wing traffic until the anticipated re-opening date of 1 Aug 2022 Runway 17 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway 35 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway access from the western side will be via taxiway A to A2 ( the one by the windsock). Runway access from the Eastern side will be via Taxiway B. Backtracking will be permitted to RWY 17/35 reduced length threshold. Note 1 ::::: Access to and from the Eastern Apron will be restricted to aircraft located in the Eastern hangar and helicopter traffic there is no other parking available on the Eastern Apron for fixed wing aircraft at this stage due to works in progress. Note 2:::: There will be a minor disruption on the first fine weather day in order to allow the reduced threshold markings to be painted on the runway. Estimated time for this to occur is 5 hours of which the runway will be unavailable. Other information Skyfuel area on the taxiway B is open as is the alternate skyfuel location on Western apron. Some hangar areas such as the SW hangars will experience a closure period to enable the new taxiway C to be constructed. (Dates TBC) Taxiway A3 and A4 are closed. Taxiway B1 open to the fuel area open – taxiway B to eastern apron closed to other non-authorised traffic. Grass strip areas will be closed. Due to the standing surface water that occurs on the runway, the runway may be closed due to rainfall to prevent aquaplaning or reducing the risk of a runway excursion. Overnight parking for transient aircraft will be limited to prior notice bookings only. All enquiries should be directed to Airport Operations on 02 4993 4228 or airport@cessnock.nsw.gov.au Regards Tony Allan Airport Coordinator |
May 7, 2022(1 event)
All day: Runway open (at reduced length) to May 13th.All day: Runway open (at reduced length) to May 13th. All day In working with the contractor Fulton Hogan, Council have secured a plan to allow the runway to open in a reduced length capacity as of 4 March 2022 - (weather permitting) for day VFR only from 0630 – 1800 as no aerodrome lighting will be available at this stage. Please remember circuit training flights can begin at 0800. There will be works on going during this period please check your notams prior to leaving home to come to airport for your flight for information regarding works or other information. This will allow operations in a limited capacity to continue until 13 May at this stage at which time the runway will then close to fixed wing traffic until the anticipated re-opening date of 1 Aug 2022 Runway 17 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway 35 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway access from the western side will be via taxiway A to A2 ( the one by the windsock). Runway access from the Eastern side will be via Taxiway B. Backtracking will be permitted to RWY 17/35 reduced length threshold. Note 1 ::::: Access to and from the Eastern Apron will be restricted to aircraft located in the Eastern hangar and helicopter traffic there is no other parking available on the Eastern Apron for fixed wing aircraft at this stage due to works in progress. Note 2:::: There will be a minor disruption on the first fine weather day in order to allow the reduced threshold markings to be painted on the runway. Estimated time for this to occur is 5 hours of which the runway will be unavailable. Other information Skyfuel area on the taxiway B is open as is the alternate skyfuel location on Western apron. Some hangar areas such as the SW hangars will experience a closure period to enable the new taxiway C to be constructed. (Dates TBC) Taxiway A3 and A4 are closed. Taxiway B1 open to the fuel area open – taxiway B to eastern apron closed to other non-authorised traffic. Grass strip areas will be closed. Due to the standing surface water that occurs on the runway, the runway may be closed due to rainfall to prevent aquaplaning or reducing the risk of a runway excursion. Overnight parking for transient aircraft will be limited to prior notice bookings only. All enquiries should be directed to Airport Operations on 02 4993 4228 or airport@cessnock.nsw.gov.au Regards Tony Allan Airport Coordinator |
May 8, 2022(1 event)
All day: Runway open (at reduced length) to May 13th.All day: Runway open (at reduced length) to May 13th. All day In working with the contractor Fulton Hogan, Council have secured a plan to allow the runway to open in a reduced length capacity as of 4 March 2022 - (weather permitting) for day VFR only from 0630 – 1800 as no aerodrome lighting will be available at this stage. Please remember circuit training flights can begin at 0800. There will be works on going during this period please check your notams prior to leaving home to come to airport for your flight for information regarding works or other information. This will allow operations in a limited capacity to continue until 13 May at this stage at which time the runway will then close to fixed wing traffic until the anticipated re-opening date of 1 Aug 2022 Runway 17 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway 35 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway access from the western side will be via taxiway A to A2 ( the one by the windsock). Runway access from the Eastern side will be via Taxiway B. Backtracking will be permitted to RWY 17/35 reduced length threshold. Note 1 ::::: Access to and from the Eastern Apron will be restricted to aircraft located in the Eastern hangar and helicopter traffic there is no other parking available on the Eastern Apron for fixed wing aircraft at this stage due to works in progress. Note 2:::: There will be a minor disruption on the first fine weather day in order to allow the reduced threshold markings to be painted on the runway. Estimated time for this to occur is 5 hours of which the runway will be unavailable. Other information Skyfuel area on the taxiway B is open as is the alternate skyfuel location on Western apron. Some hangar areas such as the SW hangars will experience a closure period to enable the new taxiway C to be constructed. (Dates TBC) Taxiway A3 and A4 are closed. Taxiway B1 open to the fuel area open – taxiway B to eastern apron closed to other non-authorised traffic. Grass strip areas will be closed. Due to the standing surface water that occurs on the runway, the runway may be closed due to rainfall to prevent aquaplaning or reducing the risk of a runway excursion. Overnight parking for transient aircraft will be limited to prior notice bookings only. All enquiries should be directed to Airport Operations on 02 4993 4228 or airport@cessnock.nsw.gov.au Regards Tony Allan Airport Coordinator |
May 9, 2022(1 event)
All day: Runway open (at reduced length) to May 13th.All day: Runway open (at reduced length) to May 13th. All day In working with the contractor Fulton Hogan, Council have secured a plan to allow the runway to open in a reduced length capacity as of 4 March 2022 - (weather permitting) for day VFR only from 0630 – 1800 as no aerodrome lighting will be available at this stage. Please remember circuit training flights can begin at 0800. There will be works on going during this period please check your notams prior to leaving home to come to airport for your flight for information regarding works or other information. This will allow operations in a limited capacity to continue until 13 May at this stage at which time the runway will then close to fixed wing traffic until the anticipated re-opening date of 1 Aug 2022 Runway 17 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway 35 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway access from the western side will be via taxiway A to A2 ( the one by the windsock). Runway access from the Eastern side will be via Taxiway B. Backtracking will be permitted to RWY 17/35 reduced length threshold. Note 1 ::::: Access to and from the Eastern Apron will be restricted to aircraft located in the Eastern hangar and helicopter traffic there is no other parking available on the Eastern Apron for fixed wing aircraft at this stage due to works in progress. Note 2:::: There will be a minor disruption on the first fine weather day in order to allow the reduced threshold markings to be painted on the runway. Estimated time for this to occur is 5 hours of which the runway will be unavailable. Other information Skyfuel area on the taxiway B is open as is the alternate skyfuel location on Western apron. Some hangar areas such as the SW hangars will experience a closure period to enable the new taxiway C to be constructed. (Dates TBC) Taxiway A3 and A4 are closed. Taxiway B1 open to the fuel area open – taxiway B to eastern apron closed to other non-authorised traffic. Grass strip areas will be closed. Due to the standing surface water that occurs on the runway, the runway may be closed due to rainfall to prevent aquaplaning or reducing the risk of a runway excursion. Overnight parking for transient aircraft will be limited to prior notice bookings only. All enquiries should be directed to Airport Operations on 02 4993 4228 or airport@cessnock.nsw.gov.au Regards Tony Allan Airport Coordinator |
May 10, 2022(1 event)
All day: Runway open (at reduced length) to May 13th.All day: Runway open (at reduced length) to May 13th. All day In working with the contractor Fulton Hogan, Council have secured a plan to allow the runway to open in a reduced length capacity as of 4 March 2022 - (weather permitting) for day VFR only from 0630 – 1800 as no aerodrome lighting will be available at this stage. Please remember circuit training flights can begin at 0800. There will be works on going during this period please check your notams prior to leaving home to come to airport for your flight for information regarding works or other information. This will allow operations in a limited capacity to continue until 13 May at this stage at which time the runway will then close to fixed wing traffic until the anticipated re-opening date of 1 Aug 2022 Runway 17 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway 35 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway access from the western side will be via taxiway A to A2 ( the one by the windsock). Runway access from the Eastern side will be via Taxiway B. Backtracking will be permitted to RWY 17/35 reduced length threshold. Note 1 ::::: Access to and from the Eastern Apron will be restricted to aircraft located in the Eastern hangar and helicopter traffic there is no other parking available on the Eastern Apron for fixed wing aircraft at this stage due to works in progress. Note 2:::: There will be a minor disruption on the first fine weather day in order to allow the reduced threshold markings to be painted on the runway. Estimated time for this to occur is 5 hours of which the runway will be unavailable. Other information Skyfuel area on the taxiway B is open as is the alternate skyfuel location on Western apron. Some hangar areas such as the SW hangars will experience a closure period to enable the new taxiway C to be constructed. (Dates TBC) Taxiway A3 and A4 are closed. Taxiway B1 open to the fuel area open – taxiway B to eastern apron closed to other non-authorised traffic. Grass strip areas will be closed. Due to the standing surface water that occurs on the runway, the runway may be closed due to rainfall to prevent aquaplaning or reducing the risk of a runway excursion. Overnight parking for transient aircraft will be limited to prior notice bookings only. All enquiries should be directed to Airport Operations on 02 4993 4228 or airport@cessnock.nsw.gov.au Regards Tony Allan Airport Coordinator |
May 11, 2022(1 event)
All day: Runway open (at reduced length) to May 13th.All day: Runway open (at reduced length) to May 13th. All day In working with the contractor Fulton Hogan, Council have secured a plan to allow the runway to open in a reduced length capacity as of 4 March 2022 - (weather permitting) for day VFR only from 0630 – 1800 as no aerodrome lighting will be available at this stage. Please remember circuit training flights can begin at 0800. There will be works on going during this period please check your notams prior to leaving home to come to airport for your flight for information regarding works or other information. This will allow operations in a limited capacity to continue until 13 May at this stage at which time the runway will then close to fixed wing traffic until the anticipated re-opening date of 1 Aug 2022 Runway 17 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway 35 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway access from the western side will be via taxiway A to A2 ( the one by the windsock). Runway access from the Eastern side will be via Taxiway B. Backtracking will be permitted to RWY 17/35 reduced length threshold. Note 1 ::::: Access to and from the Eastern Apron will be restricted to aircraft located in the Eastern hangar and helicopter traffic there is no other parking available on the Eastern Apron for fixed wing aircraft at this stage due to works in progress. Note 2:::: There will be a minor disruption on the first fine weather day in order to allow the reduced threshold markings to be painted on the runway. Estimated time for this to occur is 5 hours of which the runway will be unavailable. Other information Skyfuel area on the taxiway B is open as is the alternate skyfuel location on Western apron. Some hangar areas such as the SW hangars will experience a closure period to enable the new taxiway C to be constructed. (Dates TBC) Taxiway A3 and A4 are closed. Taxiway B1 open to the fuel area open – taxiway B to eastern apron closed to other non-authorised traffic. Grass strip areas will be closed. Due to the standing surface water that occurs on the runway, the runway may be closed due to rainfall to prevent aquaplaning or reducing the risk of a runway excursion. Overnight parking for transient aircraft will be limited to prior notice bookings only. All enquiries should be directed to Airport Operations on 02 4993 4228 or airport@cessnock.nsw.gov.au Regards Tony Allan Airport Coordinator |
May 12, 2022(1 event)
All day: Runway open (at reduced length) to May 13th.All day: Runway open (at reduced length) to May 13th. All day In working with the contractor Fulton Hogan, Council have secured a plan to allow the runway to open in a reduced length capacity as of 4 March 2022 - (weather permitting) for day VFR only from 0630 – 1800 as no aerodrome lighting will be available at this stage. Please remember circuit training flights can begin at 0800. There will be works on going during this period please check your notams prior to leaving home to come to airport for your flight for information regarding works or other information. This will allow operations in a limited capacity to continue until 13 May at this stage at which time the runway will then close to fixed wing traffic until the anticipated re-opening date of 1 Aug 2022 Runway 17 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway 35 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway access from the western side will be via taxiway A to A2 ( the one by the windsock). Runway access from the Eastern side will be via Taxiway B. Backtracking will be permitted to RWY 17/35 reduced length threshold. Note 1 ::::: Access to and from the Eastern Apron will be restricted to aircraft located in the Eastern hangar and helicopter traffic there is no other parking available on the Eastern Apron for fixed wing aircraft at this stage due to works in progress. Note 2:::: There will be a minor disruption on the first fine weather day in order to allow the reduced threshold markings to be painted on the runway. Estimated time for this to occur is 5 hours of which the runway will be unavailable. Other information Skyfuel area on the taxiway B is open as is the alternate skyfuel location on Western apron. Some hangar areas such as the SW hangars will experience a closure period to enable the new taxiway C to be constructed. (Dates TBC) Taxiway A3 and A4 are closed. Taxiway B1 open to the fuel area open – taxiway B to eastern apron closed to other non-authorised traffic. Grass strip areas will be closed. Due to the standing surface water that occurs on the runway, the runway may be closed due to rainfall to prevent aquaplaning or reducing the risk of a runway excursion. Overnight parking for transient aircraft will be limited to prior notice bookings only. All enquiries should be directed to Airport Operations on 02 4993 4228 or airport@cessnock.nsw.gov.au Regards Tony Allan Airport Coordinator |
May 13, 2022(1 event)
All day: Runway open (at reduced length) to May 13th.All day: Runway open (at reduced length) to May 13th. All day In working with the contractor Fulton Hogan, Council have secured a plan to allow the runway to open in a reduced length capacity as of 4 March 2022 - (weather permitting) for day VFR only from 0630 – 1800 as no aerodrome lighting will be available at this stage. Please remember circuit training flights can begin at 0800. There will be works on going during this period please check your notams prior to leaving home to come to airport for your flight for information regarding works or other information. This will allow operations in a limited capacity to continue until 13 May at this stage at which time the runway will then close to fixed wing traffic until the anticipated re-opening date of 1 Aug 2022 Runway 17 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway 35 length will be reduced to 720 meters (TODA) and 720 meters (LDA) Runway access from the western side will be via taxiway A to A2 ( the one by the windsock). Runway access from the Eastern side will be via Taxiway B. Backtracking will be permitted to RWY 17/35 reduced length threshold. Note 1 ::::: Access to and from the Eastern Apron will be restricted to aircraft located in the Eastern hangar and helicopter traffic there is no other parking available on the Eastern Apron for fixed wing aircraft at this stage due to works in progress. Note 2:::: There will be a minor disruption on the first fine weather day in order to allow the reduced threshold markings to be painted on the runway. Estimated time for this to occur is 5 hours of which the runway will be unavailable. Other information Skyfuel area on the taxiway B is open as is the alternate skyfuel location on Western apron. Some hangar areas such as the SW hangars will experience a closure period to enable the new taxiway C to be constructed. (Dates TBC) Taxiway A3 and A4 are closed. Taxiway B1 open to the fuel area open – taxiway B to eastern apron closed to other non-authorised traffic. Grass strip areas will be closed. Due to the standing surface water that occurs on the runway, the runway may be closed due to rainfall to prevent aquaplaning or reducing the risk of a runway excursion. Overnight parking for transient aircraft will be limited to prior notice bookings only. All enquiries should be directed to Airport Operations on 02 4993 4228 or airport@cessnock.nsw.gov.au Regards Tony Allan Airport Coordinator |
May 14, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 15, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 16, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 17, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 18, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 19, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 20, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 21, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 22, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 23, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 24, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 25, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 26, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 27, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 28, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 29, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 30, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
May 31, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
June 1, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
June 2, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
June 3, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |
June 4, 2022(1 event)
All day: Scheduled Runway Closure for Resurfacing May16 to Jul 31stAll day: Scheduled Runway Closure for Resurfacing May16 to Jul 31st All day Runway (35-17) scheduled to close for resurfacing from May 16th to Jul 31st - ie. Reopening on August 1st. Check NOTAM's for any changes to this schedule. |